{"id":1144,"date":"2026-02-01T12:32:18","date_gmt":"2026-02-01T12:32:18","guid":{"rendered":"https:\/\/davepinwell.com\/?page_id=1144"},"modified":"2026-02-13T18:11:57","modified_gmt":"2026-02-13T18:11:57","slug":"housing-developments-4","status":"publish","type":"page","link":"https:\/\/davepinwell.com\/?page_id=1144","title":{"rendered":"Housing Developments 4"},"content":{"rendered":"\n<p>INFRASTRUCTURE &#8211; THE SCHOOLS<\/p>\n\n\n\n<p>Having talked about where developers will be building or are hoping to build, and why this apparent &#8216;gold rush&#8217; to build has come about on the back of legislative change, we need to look at the capacity of the village to absorb more housing. It is here that the strongest arguments that can be made to limit the growth of Knowle.<\/p>\n\n\n\n<p>To be approved new housing developments need to be &#8216;sustainable&#8217; and sustainability depends upon access to services. In other words, sites need ready access to public transport, shops, schools, health services and community facilities and factors such as leisure space, sports fields, roads and parking come into play, as does the opportunity to reduce reliance on the car.<\/p>\n\n\n\n<p>In comparison to other areas, Knowle does quite well for good shops and sports\/leisure capacity, we have good schools but capacity today is tight, public transport is available but has limitations, roads suffer from regular congestion, parking capacity is too frequently exhausted and access to health services is very poor. This series of posts will look at the situation with each in relation to potential future developments and we will start in this post with schools.  <\/p>\n\n\n\n<p>The partial Arden Triangle map, below, shows the existing Arden Academy land (green), additional land to be ceded to the Academy (light blue) and land  to be ceded for a new Primary School (plum).<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><a href=\"https:\/\/davepinwell.com\/wp-content\/uploads\/2026\/02\/schools.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"650\" height=\"726\" src=\"https:\/\/davepinwell.com\/wp-content\/uploads\/2026\/02\/schools.jpg\" alt=\"\" class=\"wp-image-1146\" srcset=\"https:\/\/davepinwell.com\/wp-content\/uploads\/2026\/02\/schools.jpg 650w, https:\/\/davepinwell.com\/wp-content\/uploads\/2026\/02\/schools-269x300.jpg 269w\" sizes=\"(max-width: 650px) 100vw, 650px\" \/><\/a><\/figure><\/div>\n\n\n<p>The Department for Education has allocated funding for the construction of a modern, replacement Arden Academy. It is unclear at this stage where in the available footprint of the extended site that school will be built. It is understood that it is likely to be a straight replacement school not an expanded one. If that is the case then the catchment area of the school may need to be reduced. <\/p>\n\n\n\n<p>The demands of new housing at Blythe Valley and other potential new housing in the Hockley Heath area, particularly to the south of the that village where South Warwickshire Council would wish to build homes, and to the west of Shirley might lead to another school being built somewhere along the A34 corridor which could include some of Dorridge in its catchment.<\/p>\n\n\n\n<p>The choice of Primary School site within the Arden Triangle has caused some controversy given that the only vehicular access will be through the residential housing of the Kler Construction development. However, one upside of this is that there is likely to be some eagerness to build that school at a similar time as the housing to minimise subsequent disruption by construction traffic as that new estate matures and to provide capacity for families moving to the Triangle.<\/p>\n\n\n\n<p>This will be a new Primary School and not a replacement for an existing school. No decision has been made yet on whether it will be one-form or two-form entry. Falling birth rates across the borough are increasing projected capacity in existing schools and thus demand being forecasted for the new school is subject to some fluidity at this stage.<\/p>\n\n\n\n<p>In <a href=\"https:\/\/davepinwell.com\/?page_id=1153\">the next post of this series<\/a> I will take a look at the impact on GP surgeries and sports and leisure facilities. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>INFRASTRUCTURE &#8211; THE SCHOOLS Having talked about where developers will be building or are hoping to build, and why this apparent &#8216;gold rush&#8217; to build has come about on the back of legislative change, we need to look at the capacity of the village to absorb more housing. It is here that the strongest arguments [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"_links":{"self":[{"href":"https:\/\/davepinwell.com\/index.php?rest_route=\/wp\/v2\/pages\/1144"}],"collection":[{"href":"https:\/\/davepinwell.com\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/davepinwell.com\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/davepinwell.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/davepinwell.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1144"}],"version-history":[{"count":3,"href":"https:\/\/davepinwell.com\/index.php?rest_route=\/wp\/v2\/pages\/1144\/revisions"}],"predecessor-version":[{"id":1165,"href":"https:\/\/davepinwell.com\/index.php?rest_route=\/wp\/v2\/pages\/1144\/revisions\/1165"}],"wp:attachment":[{"href":"https:\/\/davepinwell.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1144"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}